2nd Hole Project

This was our major project over the past months which involed adding a bunker to catch the longer hitters and reshaping a poor greenside bunker that always washed out and mixed sand and soil.

We installed drains in both plus added artificial edges and a liner to stop any sand contamination with the soil below. These will be sanded and put into play very soon.

[rl_gallery id=”59470″]

Scroll to top